Infrastructure Acceptance

The first focus of the AI Cloud Acceptance Design Assessment. Map how facilities, hardware, platform and operating evidence will support a go-live decision, then define a pilot.

Discuss your assessment
View all service lines

Can this environment enter or remain in service?

Start here when a new cluster, capacity expansion or supplier handover exposes unclear acceptance requirements. The design assessment reviews your process and approved samples. It does not test production hardware or declare the environment ready.

Read a sample assessment

Follow an infrastructure release.

From a Kubernetes observation to an accountable acceptance decision. Watch the release story, then inspect the records and change the outcome yourself.

Synthetic example—not a live product demo, customer result or list of available integrations. Sources and checks are agreed for each pilot.

Watch the release story.

Skip to the interactive example
Narrated animation with English captions and a full transcript. Uses an automated voice and synthetic evidence; no customer systems are connected.
Read the video transcript

What makes this cluster ready?

A new AI compute cluster is ready for handover. But healthy systems alone cannot tell the owner whether to release it.

This example uses synthetic evidence. Its acceptance manifest sets the cluster and configuration, release boundary, required evidence and validity, responsible teams and approvals, and exception and change rules. It is not a live integration demo.

Read the technical evidence.

Approved exports bring together hardware inventory, GPU validation, Kubernetes node conditions, and network and storage reports.

Each record must apply to the assessed configuration. Platform engineering owns the selected Kubernetes node and resource export. Hardware, GPU and Kubernetes checks pass, with the nodes reporting Ready, but a network path fails validation. The interim result is blocked because other required records or approvals are missing. A healthy scheduler is not proof of a ready service.

Check the operating handover.

Facilities, recovery and service operations supply different kinds of evidence: a signed power and cooling handover, a witnessed restore, and accepted runbooks and responsibilities.

The cooling system record is present, but its required signed witness report is missing. The facilities lead must close that gap. Passing technical checks cannot replace it.

The recovery and operating handover checks pass, but the interim result is blocked.

Bring the decision owners in.

Security reviews access and data boundaries. Procurement checks supplier deliverables and open defects. The business owner checks service scope and tenant commitments.

Supplier obligations and service commitments pass their checks. The selected access review is missing the security authority's required approval record. With both mandatory approvals missing, the recommendation is blocked. Every gap has a named owner, not an average score.

Close each gap with evidence.

The facilities lead supplies the signed witness report. That requirement now passes, but the recommendation stays blocked until the security authority also approves.

Complete is not the same as passing.

Security approval arrives. The network and storage leads own the selected fabric validation and storage test reports. The evidence set is complete, but the network requirement still fails. The recommendation changes to not ready. The failed path still needs action.

Make the release reviewable.

After remediation, an approved path retest passes for this configuration. All example requirements are now satisfied, so the recommendation is ready.

The record links each result to its requirement, evidence and owner. The customer still makes and records the final release decision. This demonstration does not grant approval.

Recheck what a change invalidates.

Now change the firmware. The hardware baseline and GPU results describe the old configuration. They no longer prove the current cluster, so the recommendation is blocked again.

The GPU platform team owns the selected customer-supplied GPU validation report. The Kubernetes and network-and-storage checks still pass.

Refresh the affected evidence before it can support a new release. In the interactive example below, you can resolve these gaps yourself or explore a scoped exception and its expiry.

Design this around your environment.

The first paid engagement is the AI Cloud Acceptance Design Assessment. We map your process, review approved samples and define requirements, evidence gaps, validity rules and decision owners.

You receive a draft acceptance design and a separately scoped pilot proposal. Production checks, connectors and remediation are not included in that assessment. Your team retains production access and release authority.

Download video

Now explore the evidence.

Example AI compute cluster / customer-owned release

Start with the release—not the dashboard.

A new AI compute cluster is being handed from suppliers to an operating team. The example manifest names the cluster, required evidence, responsible teams and who can approve exceptions.

Interim resultBLOCKED

0 of 10 source groups reviewed. Unimported mandatory records still block the assessment.

No audio. Every step is readable and selectable.

Change the situation.

Explore why evidence, ownership and timing change the recommendation.

First handover

Kubernetes reports healthy nodes, but the cooling handover and security approval are missing. A network validation report also records a failure.

Facilities leadPower & cooling
Security authoritySecurity & identity
Network and storage leadsNetwork & storage
Example recommendationBLOCKED

Required evidence is still missing or no longer applies. Resolve each gap; passing checks do not cancel it.

What still needs attention

These controls change the example only. Ortalos does not repair infrastructure, grant exceptions or approve release on your behalf.

Bring the right questions to your first assessment.

The design assessment maps your real sources, decision owners and gaps. A separately scoped pilot can test that design against approved evidence.

Requirements we help you define.

Use the design assessment to identify which checks belong in your pilot. The scope, criteria and approved evidence sources are agreed for your environment; Ortalos does not perform the underlying hardware tests.

Inventory: installed compute, storage and network resources match the agreed design

Compatibility: hardware, software and firmware versions have documented support

Configuration: validation results reflect the environment as it is now

Capacity: performance evidence addresses the intended use and agreed limits

Facilities: power, cooling and rack requirements have supporting handover records

Dependencies: tenant, supplier and operating responsibilities have named owners

Handover: unresolved faults and supplier actions are visible before acceptance

Exceptions: each departure has an approval, an owner and an expiry

Change: affected requirements are checked again when the environment changes

What the design assessment delivers.

Your assessment pack contains the workflow and evidence map, draft requirements, unresolved gaps and a fixed pilot proposal. The sample shows how reviewed records become findings and proposed pilot requirements—not a go-live approval.

Download sample assessment (text)

Sample assessment: GPU cluster handover

Illustrative assessment excerpt. The environment, records and findings are fictional—not a customer engagement, test result or production approval.

An operating team wants to take over a Kubernetes GPU cluster for internal inference workloads. The design assessment asks what evidence and responsibilities need to be agreed before a pilot can test the acceptance process.

In this example, the review uses sanitized inventory and supplier reports, a handover runbook, a release request and a security review note. It does not inspect the live cluster or verify the underlying test results.

The report covers a different configuration

Sample record
The inventory lists updated fabric firmware. The supplier validation report names the earlier version.
Assessment judgment
That report cannot establish performance for the changed configuration. This is an evidence gap, not a demonstrated hardware failure.
Proposed action
The infrastructure lead and supplier must agree the affected test scope. The draft requirement links each validation result to a dated configuration baseline and names the changes that require fresh evidence.

The handover leaves a dependency without an owner

Sample record
The runbook names platform on-call and hardware support. Neither the runbook nor the responsibility list assigns storage and identity escalation during recovery.
Assessment judgment
A recovery procedure alone does not establish who can carry it out. The pilot needs an agreed escalation path; it cannot assume the platform team owns every dependency.
Proposed action
The operating lead must confirm the storage and identity contacts, their responsibilities and the evidence needed from a customer-run exercise. Record unresolved ownership in the gap summary.

The release request is broader than the review

Sample record
The release request says “internal inference” without a data boundary. The security note covers synthetic test data only.
Assessment judgment
The review does not support a conclusion about customer-data workloads. Expanding the scope requires the relevant data and security owners to agree what must be reviewed.
Proposed action
Propose a pilot limited to synthetic workloads. The service owner and security lead must confirm that boundary; broader workload admission remains outside this pilot.

From findings to a pilot proposal

Proposed scope
Use approved sample records for this cluster to test configuration traceability, handover ownership and the agreed workload boundary. Define any later data connections separately.
What would demonstrate success
Reviewers can trace a conclusion to its source and owner; a configuration change makes the affected evidence unusable; missing ownership remains unresolved. Agree the test cases and success criteria with the customer before the pilot.
Decisions still needed
The customer must confirm the scope, evidence-sharing permissions, responsible roles and success criteria before accepting a fixed pilot proposal. These findings do not approve service entry.
Outside the design assessment
Production development, credentials, infrastructure changes, hardware tests and recovery operations. The customer retains approvals; delivering a pilot is a separate engagement.
Full design assessment deliverables
  • Current workflow and responsibility map — who supplies evidence, reviews it and approves acceptance
  • Tool and evidence inventory — approved sources, sample records and unsupported assumptions
  • Draft acceptance manifest — requirements, owners, evidence rules and known gaps
  • Exception and change model — approvals, expiry and triggers for reassessment
  • Pilot design — architecture, data flow, named integrations and security requirements
  • Fixed pilot proposal — scope, delivery roles and agreed measures of success

Separate failed checks from missing evidence.

The evidence model distinguishes a failed check from one that cannot be evaluated. The initial design assessment defines these rules; it does not issue a production approval.

READY

All applicable mandatory checks pass, the evidence is current and no blocker remains.

READY WITH EXCEPTIONS

Required checks pass or have current, authorized exceptions with clear limits and an expiry. No blocker remains.

NOT READY

A mandatory check failed without an approved exception.

BLOCKED

Required evidence or approval is missing, out of date, unusable or untrusted.

Operating boundary

The design assessment is advisory. It excludes production development, production credentials, infrastructure changes, hardware testing and emergency support. Ortalos designs the acceptance process and evidence requirements. Your team keeps production access, changes, approvals and final acceptance. Legal advice and accredited certification remain with qualified specialists.

Start with the decision your team needs to make.

Discuss your assessment